Pre Insulated Pipe (PIP)

Introducing a new energy saving,condensation free insulation system

What is ZECO Pre-Insulated Pipe?

It is made from three basic components:

  • A pressure-tight casing
  • The service pipe
  • Rigid polyurethane foam

Who makes it?

ZECO, the leaders in air management systems now offer pre-insulated pipes for both above grounds and underground applications. All manufactured in ZECO’s state-of-the-art factory under stringent quality control.

APPLICATIONS:

 ZECO pre-insulated pipes are best suited for air conditioning with child water / hot water, piping systems, process piping system and domestic hot water piping system with media temperature ranging between -50o C to +100o C in any environmental conditions.

Ideal For Overhead, Underground & Above Ground Applications

Excellent Properties:

Rigid polyurethane foam has the lowest thermal conductivity and is coefficient of expansion of all known insulating materials. Thus help to save more energy compared to the commonly used electrometric insulation.

The outer casing material is galvanized, stainless steel or high density polyethylene tubes which will withstand extreme climatic conditions.

The pressure tight spiral-locked seam tube or high density polyethylene tube provides ultimate vapor barrier.

Polyurethane foam provides very good damping properties. It reduces noise considerably.

The pressure tight locked seam tube or the high density polyethylene homogenous and seamless tube ensures water tightness.

Comply to Class O fire rating in which having a Class 1 fire rating to BS 470: part 7, 1997 (surface spread of flame test) and a fire propagation index to BS 470 part 6 (1989) test with values of 1 less than 12 and 11 less than 6.

With compressive strength up to 275 kpa, the insulation coupled with the robust outer casing, ZECO pre-insulated pipe can be hung directly on its casing.

The polyurethane foam utilizes CFC free blowing agent.

COMPARISON BETWEEN ZECO PRE-INSULATED PIPE AND SITE INSULATED PIPE

 ZECO pre-insulated pipe can reduce energy loss through the pipe insulation by up to 40% as compared to the conventional insulation. The following chart shows a clear comparison of the heat gained in the fluid by using the 2 types of insulation respectively.

Advantage of Pre Insulated Pipe

  • Rigid polyurethane foam has the lowest thermal conductivity and coefficient of expansion of all known insulating materials (Tested to ASTM C 518). Thus help to save more energy compared to the commonly used elastomeric insulation.
  • The outer casing material is galvanized, stainless steel or high-density polyethylene tubes which will withstand extreme climatic conditions.
  • The pressure-tight spiral-locked seam tube or high-density polyethylene tube provides the ultimate vapor barrier.
  • Polyurethane foam provides very good damping properties. It reduces noise considerably.
  • The pressure-tight locked seam tube or the high-density polyethylene homogeneous and seamless tube ensure water tightness.
  • Zeco Pre-Insulated pipe system can be used over a wide range of temperatures between -50°C up to +140°C.
  • Comply to Class O fire rating in which having a Class 1 fire rating to BS 470: part 7, 1997 (surface spread of flame test) & a fire propagation index to BS 470: part 6 (1998) test with a value of 1 less than 12 & 11 less than 6.
  • With compressive strength up to 275 kpa, the insulation coupled with the robust outer casing. Zeco pre-insulated pipe can be hung directly on its casing.
    The polyurethane foam utilizes CFC free blowing agent.

Comparison Pri-Insulated Pipe And Site Insulated

Site Insulated Pipe
Pre-Insulated Pipe
  1. There is Air Gap Between Pips & Insulation.
  2. Inconsistent Density of insulation through the entire length of pipe.
  3. Water vapor Ingress causing condensation.
  4. Circumferential joints, Longitudinal.
    Under Ground Piping:
  5. A. In case of sand cement plaster cladding water seepage.
    B. Incase of Tar felt Cladding Insulation value lost as tar felt is applied with Fire Burner.
  6. Installation 100% on Site Work, Time consuming.
  7. Quality of Insulation depends on Site Installers. No Quality Control check. No Insulation value check.
  8. Cladding & insulation easily damaged due to the gap between the cladding and insulation.
  9. Pipe Supports installed before Insulation thus allowing zero possibility of change in Piping layout without insulation removal.
  1. Due to PUF Injection, insulation is formed on Pipe thus No Air Gap between pipe & insulation.
  2. Consistent Density of insulation through the entire length of the pipe as PUF injection insulation is formed on Pipe.
  3.  No water vapor Ingress as PUF injection insulation is formed on Pipe, thus no condensation.
  4. Homogeneous, No joint, No Possibility of Water Vapor.
  5. Cladding with HDPE Seamless pipe, No Seepage & No Insulation damage.
  6. Installation work at site reduced to 10% Thus Faster installation time.
  7. Consistent Quality Control in a factory. Insulation value Check available in the factory.
  8. Tough & durable due to bonding of insulation between Pipe & Casing.
  9. Pipe Supports installed on Insulation Casing thus allowing flexibility of change in Piping layout insulation removal.